Market snapshot · ↗Bitcoin price$77,735Network hashrate936 EH/sDifficulty127.45 T
ASIC.TOOLS / Preview

Bitcoin Mining & ASIC News: Market, Hardware and Energy · Page 25

Mining news and original analysis with dated primary sources.

10.09.2026
HIVE’s BUZZ HPC teams up with ProCogia for sovereign AI

HIVE’s BUZZ HPC teams up with ProCogia for sovereign AI

Dedicated Canadian GPU capacity and applied-AI services are a new commercial partnership, not an ASIC upgrade or disclosed new MW.

Fed raises its target range to 3.75–4%: the ASIC budget question

Fed raises its target range to 3.75–4%: the ASIC budget question

The September 16 decision changes the financing backdrop. Loan terms, electricity costs and Bitcoin revenue remain separate inputs.

FutureBit examines Bitcoin difficulty and expected BTC yield

FutureBit examines Bitcoin difficulty and expected BTC yield

An independent calculation explains why a difficulty decline and an expected-yield increase have different percentages.

Zcash coinholders back halvings and proposed 25-second blocks

Zcash coinholders back halvings and proposed 25-second blocks

What the NU7 poll means for miners: governance support, activation evidence and reward accounting are separate questions.

Hammer BC08 v1.0.4 updates modes, skills and fan behavior

Hammer BC08 v1.0.4 updates modes, skills and fan behavior

The official update is available in our local archive. How to verify its file and evaluate changes on one compatible device.

Bitdeer reports 1,310 BTC produced in August

Bitdeer reports 1,310 BTC produced in August

How to compare monthly Bitcoin production, hashrate and energy without confusing output with profit.

ViaBTC partners with Mempool on transaction acceleration

ViaBTC partners with Mempool on transaction acceleration

What transaction acceleration changes for users and what miners should measure.

AGM outlines commercialization plans for its HashBeaver node

AGM outlines commercialization plans for its HashBeaver node

From a pilot to a purchasable miner: the evidence buyers should request.

DMG shifts Christina Lake tenant-server timing toward 2027

DMG shifts Christina Lake tenant-server timing toward 2027

How to read an AI conversion timeline without confusing planned capacity with operating revenue.

GridPool releases StartOS and Umbrel beta packages for native Stratum V2

GridPool releases StartOS and Umbrel beta packages for native Stratum V2

September 15 packages simplify deploying GridPool. These are early server-side betas, not universal ASIC firmware; native SV2 compatibility remains essential.

Bitdeer AI secures 65.1 MW for A202 in Johor; energization targeted for 2027

Bitdeer AI secures 65.1 MW for A202 in Johor; energization targeted for 2027

A ten-year data-center agreement covers A202 in Malaysia. The 65.1 MW refers to IT load; customer contracts and the $7 billion opportunity pipeline remain separate.

Soluna’s Dorothy gets conditional ERCOT status for 100 MW

Soluna’s Dorothy gets conditional ERCOT status for 100 MW

Soluna reports conditional Base Load classification for Dorothy and a separate 50 MW request under study. What these milestones mean for a wind-linked mining campus.